• 2019 – GERMANY – OFFSHORE

    Supervising the installation and commissioning of SCADA and protection systems on Borwin Gamma platform. Checking the proper functionality of SICAM 230 and S7 PLCs, proposing new solutions for optimizing the monitoring of the process.

  • 2019 – QATAR – continued

    Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing, and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

  • 2019 – SWEDEN

    Manufacturing protection cubicles in Bucharest. Engineering relays in HTSC office in Bucharest, relays which are part of the cubicles. Testing the functionality of the relays in the cubicle with our own simulator produced by HTSC. Preparing and organizing the FAT. Installation of primary equipment in the substation. Installation and commissioning of protection cubicles. Energizing the substation.

  • 2019 – ALGERIA

    Oued El Abtal and Hassi’R’Mel substations – installation, commissioning and testing of Partial Discharge Monitoring systems produced by SIEMENS. Training of our engineers in SIEMENS UK.

  • 2019 – FRANCE

    Pierrelatte – Preparation of FAT. Preparing settings and commissioning of relays like MICOM P142, P545, P645 and REF615.

  • 2018 – STUPINA

    SCADA investigation and application debugging regarding the problems appeared in the communication with MOXA devices. Debugging of command procedures in order to read the correct status of the device.

  • 2018 – CONGO

    INGA Hydro Power Plant – Engineering and commissioning the MODBUS communication between AC500 PLC and SIEMENS STEP7 WinCC SCADA system. Configuring all signals for auxiliary services and drainage pumps control: commands, digital inputs, digital outputs and analog values. Integration of a SIEMENS RTU, engineering and commissioning, in order to supervise the drainage pumps.

  • 2018 – SWEDEN

    Ingemaro substation – maintenance tests for seven REF543 relays with Rogovski Coil. Testing the relays without de-energizing the bays.

  • 2018 – UNITED KINGDOM – continued

    Rampion onshore substation – Functional check of protection panels. Interface between protection panels – GIS, AIS, Transformers etc. Protection tests (SIEMENS 6MD, 7SA, 7UT, ABB REx670, REx650, RET615). SCADA signal tests.