• 2008 – QATAR

    Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, LON, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

  • 2008 – QATAR

    Phase 7 project substations – ANS, DRS, AWS – ABB MicroSCADA, COM581, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

  • 2007 – Algeria – continued

    Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration

  • 2007 – Italy

    Vado Ligure – Installation and commissioning of MicroSCADA ABB Control System. Unit testing, problem determination, configuration investigation, configuration changes, code investigation, code fix, installation supervision, etc.

  • 2007 – Spain

    Ferrol – Supervising the installation of REF542 plus relays on a ship. Engineering the relays, testing the relays and energizing.

  • 2007 – Libya – continued

    Testing and commissioning of ALSTOM protection relays and primary equipment (MERLIN GERIN). Defect clearance of whole 400/220 kV substation.

  • 2006 – Ethiopia

    Testing and commissioning of ALSTOM protection relays and primary equipment.

  • 2006 – Morocco

    Testing and commissioning of ALSTOM protection relays and primary equipment. Defect clearance of whole 400/220 kV substation.

  • 2006 – Libya

    Testing and commissioning of ALSTOM protection relays and primary equipment (MERLIN GERIN). Defect clearance of whole 400/220 kV substation.