• 2006 – Algeria – continued

    Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration

  • 2005 – Algeria

    Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration.