2015 – ZAMBIA – continued
330/33/11kV: Lumwana S/S, 330/33/11kV Kalumbila S/S, 330/33/11kV Kansanshi S/S,330/33/11kV, Lusaka West S/S Zambia – protection relays commissioning, ABB Switchgear commissioning, Control and Protection System testing (REL670, RED670, RET670, REJ525, 7SA522, 7SD523, P120, MBCI). Checking the installation and testing the Teleprotection equipment: SWT and NSD.
2015 – PAKISTAN – continued
Full commissioning of protection relays and ABB SCADA systems for 2 x 132/22 kV electrical substations deserving 2x50MW wind farm projects at Gharo, Thatta District / Pakistan (Fauji Foundation Wind Energy Limited – FWEL-I & FWEL-II) – MicroSCADA v9.3. IEC61850, IEC60870-5-101 Slave, IEC60870-5-104 Master / Slave, Modbus TCP/IP Communications, database & HMI configuration, signal testing, electrical supervision
2015 – SWEDEN
Umea – Stornorrfors Hydro Power Plant – Engineering, testing and commissioning of REG670. Successful SAT 155 MVA hydrogenerator.
2015 – SWEDEN
Junsele – Degerforsen Hydro Power Plant and Substation – Engineering, testing and commissioning of REG650, RET650, REL650. 2×35 MVA hydrogenerators and main output transformers. SCADA signals and IEC61850 simulation.
2015 – SWEDEN
Junsele – Hallby Hydro Power Plant and Substation – Engineering, testing and commissioning of ABB REG670, RET670. 80 MVA generator lockout logic change, IEC61850 signal list modification and testing.
2015 – SWEDEN
Sundsvall – Hydro Power Plant and Substation – Engineering, testing and commissioning of REG650. Successful FAT.
2015 – KUWAIT
Rawdatain Transmission Substation – Engineering, commissioning and testing REL670, RET670, SIPROTEC 4 7SAxx, MICOM P14NB. Factory hardware modifications and functional testing.
2014 – QATAR – continued
Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.
2014 – PAKISTAN
Full commissioning of protection relays and SCADA systems for 2 x 132/22 kV electrical substations deserving 2x50MW wind farm projects at Gharo, Thatta District / Pakistan (Fauji Foundation Wind Energy Limited – FWEL-I & FWEL-II) – MicroSCADA v. 9.3. IEC61850, IEC60870-5-101 Slave, IEC60870-5-104 Master / Slave, Modbus TCP/IP Communications, database & HMI configuration, signal testing, electrical supervision.